// Takeoff service · Div 27 / 28 / AV · Div 26 devices

Send us the plans. Get the takeoff back in two days.

You keep bidding; we do the counting. Every device on the set is located and counted by Majic Takeoff, cross-checked against the engineer's schedules and specs, and checked by an RCDD before it ships. Your first takeoff, up to 30 sheets, is free.

SMALL

Up to 30 sheets

Tenant finish-outs, small offices, single-trade sets.

$149per takeoff

First one free. Two business days.

  • Counts by device and by sheet
  • Cable drops and footage estimate
  • Gaps quoted as marked allowances
LARGE

121 sheets and up

Campuses, hospitals, mixed-use, all-trades sets.

$699per takeoff

Sets over 300 sheets are quoted first. Three business days.

  • Everything in Standard
  • Per-building or per-phase breakouts
  • Alternates kept out of the base count
ESTIMATOR PLAN

8 takeoffs a month

For subs who bid every week and need a steady second estimator.

$1,295per month

Any size up to 120 sheets. Unused takeoffs roll one month. Cancel any time.

  • Priority turnaround
  • Addenda re-counted free
  • Your labor rates on every takeoff

Add-ons

Add-onWhat you getPrice
Priced proposalLabor and material priced at your rates and markup, ready to send to the GC.+$150
RushBack in one business day instead of two or three.+50%
Addendum re-countChanged sheets re-counted and the difference shown line by line.$49
Wi-Fi designAccess-point layout for the same set. See Wi-Fi design.$195

Order a takeoff

Any link we can open. No upload needed.

Scope to count

Nothing is charged now. We confirm scope and price first.

What comes back

  1. A takeoff spreadsheet

    Every device by type and by sheet, with drop counts, cable footage and the rough-in it implies.

  2. Marked-up count sheets

    PDF pages showing what was counted where, so your estimator can check any line in seconds.

  3. A scope sheet

    What the specs add, what is owner-furnished, and every allowance marked where the documents don't say.

Who does the counting?

Majic Takeoff reads the whole set several ways and reconciles the readings against the schedules. An RCDD with 12 years in structured cabling checks every takeoff before it goes out.

Is my bid private?

Yes. Your drawings are processed on our own servers in Missouri, used only for your takeoff, and never shared.